The Product Recovery Demonstration
Program was created for the benefit of all parties involved to determine
what method and equipment would be best suited for recovering LNAPLs or
DNAPLs at a site.
PROGRAM BENEFITS:
Faster approvals from responsible
parties and regulations
Guaranteed remediation results
Consultants get actual site
remediation data, system training, and actual cost/performance
data
Clients see an actual working
solution prior to acquisition
Regulators see actual cost/performance
data
XITECH has the opportunity to
compare its technology against other approaches and competitive
technologies
XITECH is happy to provide its ADJ
product recovery system free of charge to any environmental professional
for a two week pilot study. The responsible party requesting this
service must assume all liability for the installation and operation during
this pilot study, assume responsibility for the security of all XITECH
equipment while on the project site, assume the responsibility for decontamination
of the equipment and disposal of any contaminated tubing, and assume responsibility
for safe transport of the pilot study equipment back to XITECH at the
completion of the two week period.
WHAT XITECH PROVIDES:
A Skimmer, 2500ES
Timer with high level tank shutoff sensor assembly, well cap, all
necessary tubing for air supply and product discharge, gas supply
regulator, and operation manual.
WHAT THE PARTICIPANT PROVIDES:
Security of XITECH property,
265 cubic foot bottle of nitrogen gas, electrical power (AC or
12 volt DC), holding tank for the product, technician for installing
the system and prompt return or
purchase
of the
system
at the end
of the 2 week pilot study.
HOW TO GET STARTED:
Fill out questionnaire below
or call the XITECH main office.
WHAT TO EXPECT:
Xitech will be able to ship a complete recovery
system within two weeks from completing all necessary site information.